Project Process: Big’ P’s Lighting Install

November 27th, 2013

Some of the most exciting days happens towards the end when the finishing touches start to go in – typically what feels like an eternity to happen! This last site visit was like Christmas – the wood for the stairs was being made and installed (Killer design from Walter Jacob Architects that we’re collaborating with on this project) and allot of the key lighting pieces were in or in the process of going in. We got to watch our primary piece being installed- the custom Terzani Mizu glass light from Casa Design. Right now it just looks like a bunch of sugar cubes! The glass balls will probably stay looking like sugar cubes till move in to protect them. Check out some more of the excitement below! The last photo is an amazing light with 3 rings, the Citadel Composition 3 Ring from Quasar that we also sourced from Casa Design - those ladies have some amazing modern lighting~!

Kristina Crestin Design_Big P lighting install

Architecture by Water Jacob Architects and the builder is Apex Carpentry.

KC signature

 

Leave a Reply

Image 01 Image 02 Image 03 Image 04 Image 05 Image 06 Image 07 Image 08 Image 09